Norwood Road Stage 1 Upgrade

Client: City of Albany
Region: Great Southern WA

The Scope of Work included:

  • vegetation clearing, widening and grubbing, preparation of road base;
  • full road and pavement reconstruction (approximately 1.1 km) with a seal width of 8.6m;
  • removal of granite rock outcrop;
  • installation of stormwater drainage; kerbing, bitumen with accurate line marking; and
  • remove and properly dispose of all residual material and debris from site.