Storm Damage
Client:
Fulton Hogan
Region: Great Southern WA
Region: Great Southern WA
Palmer Civil Construction was engaged at the time of the WANDRA AGRN743 event by Fulton Hogan in the emergency opening up works on various highways around Ravensthorpe. We are currently engaged by Fulton Hogan on behalf of Main Roads Great Southern, delivering recovery works for WANDRA. Works include, but are not limited to:
- shoulder repairs,
- road pavement repairs,
- drain silt removal,
- re-instate drainage,
- structure repairs to floodways,
- cement stabilising, and
- cleaning of existing culverts of silt, debris and rock protection.
This work is has been carried out on M005 highway, Jerramungup > Gnowangerup > Broomehill Road intersection and the M015 Formby South Road.