Reinstatement of Flood Damage Infrastructure
Client:
Shire of Northam
Region: Wheatbelt
Region: Wheatbelt
The Scope of Work
Reinstatement / repairs is based on ‘like-for-like’ purpose. Proposal for improvement or modification of works or part of works shall be submit to Client with supporting documents. Brief scope of work is below but not limited to:
- Site clearing, removal of vegetation and disposal.
- Providing all the required plant, equipment and labour to complete the works.
- Detailed program of work which shall be supported by detailed work methodology
- Traffic control
- Provide survey set out points, levels and markings as per work requirements
- Dewatering, slush removal, temporary diversion and as such means approved by the client and to provide all the requisite plant and equipment.
- Utilities and Services in close proximity of work area including but not limited to DYBD
- Disposal of Surplus / Unusable Material from site
- Gravel re-sheeting, or shoulder reconstruction that comply with materials specification provided
- Reinstate roadside furniture
- Inspection and testing by LIQUID LABS WA, NATA Accredited Laboratory