Norwood Road Stage 1 Upgrade
Client:
City of Albany
Region: Great Southern WA
Region: Great Southern WA
The Scope of Work included:
- vegetation clearing, widening and grubbing, preparation of road base;
- full road and pavement reconstruction (approximately 1.1 km) with a seal width of 8.6m;
- removal of granite rock outcrop;
- installation of stormwater drainage; kerbing, bitumen with accurate line marking; and
-
remove and properly dispose of all residual material and debris from site.