Mueller St Extension (two contracts)

Client: City of Albany
Region: Great Southern WA

The Scope of Work Included:

  • vegetation clearing, widening and grubbing, site preparation;
  • bulk earthworks to cut / fill / remove 20,000 m3 of topsoil and material;
  • construct limestone sub-base;
  • install stormwater drainage, bitumen with accurate line marking;
  • respread and finish topsoil on embankments;
  • remove and properly dispose of all residual material and debris from site.