Reinstatement of Flood Damage Infrastructure

Client: Shire of Northam
Region: Wheatbelt

The Scope of Work

Reinstatement / repairs is based on ‘like-for-like’ purpose. Proposal for improvement or modification of works or part of works shall be submit to Client with supporting documents. Brief scope of work is below but not limited to: 

  • Site clearing, removal of vegetation and disposal.
  • Providing all the required plant, equipment and labour to complete the works.
  • Detailed program of work which shall be supported by detailed work methodology
  • Traffic control
  • Provide survey set out points, levels and markings as per work requirements
  • Dewatering, slush removal, temporary diversion and as such means approved by the client and to provide all the requisite plant and equipment.
  • Utilities and Services in close proximity of work area including but not limited to DYBD
  • Disposal of Surplus / Unusable Material from site
  • Gravel re-sheeting, or shoulder reconstruction that comply with materials specification provided
  • Reinstate roadside furniture
  • Inspection and testing by LIQUID LABS WA,  NATA Accredited Laboratory